EV Charging in Strata: Are you keeping pace with the owners corporation rules and approval processes?

As more residents seek access to electric vehicle charging, Owners Corporations need a clear way to assess requests. Whitbread Insurance Brokers shares the insurance and risk considerations that can help committees review their building’s approval processes.

A single charger may seem straightforward. In a shared building, however, one request can raise broader questions about electrical capacity, common property, fire safety, maintenance, future demand and who is responsible if something goes wrong. A clear approval process can help committees work through these questions, keep appropriate records and identify insurer requirements before making a decision.

 

Start with the building, not the charger

Before approving or installing EV charging infrastructure, the owners corporation needs to understand whether the building can safely support it, including its electrical infrastructure, fire protection systems and emergency management arrangements. Australian Government guidance notes that people living in apartments or other shared buildings may need approval from their strata body before installing EV charging infrastructure1. Before making a decision, owners corporations may need to consider:

  • Electrical capacity Whether existing switchboards, cabling, consumer mains and submains can safely manage increased demand
  • Condition and upgrades Whether the building’s electrical infrastructure is in good condition and whether upgrades are needed
  • Location and access How the proposed location interacts with common property, safety systems and emergency access
  • Future demand How additional charging requests will be managed and whether the building needs a coordinated EV charging plan
  • Specialist input Whether advice is required from qualified electrical contractors, fire safety specialists, engineers or other relevant professionals

The NSW Government outlines individual, shared and scalable options for EV charging in strata buildings. Planning for one charger is different from planning for future demand across a whole building2.

 

Use the approval process to gather the right information

By-laws and approval processes can help an owners corporation assess requests consistently. From an insurance and risk perspective, consider whether the process makes the following clear:

  • Application Whether approval is required before a charger is installed, connected or any work begins.
  • Supporting information The proposed location, equipment details, electrical assessment, plans and installer information required with an application.
  • Decision process Who assesses the proposal and what other professional advice or owners corporation approval may be required.
  • Costs Who is responsible for assessment, installation, common property work, metering, electricity, maintenance, repairs, removal and reinstatement.
  • Ongoing use How faults or damage are reported, what records are retained and who maintains the charger and associated infrastructure.
  • Future changes How additional charging requests, a change of resident or the removal of a charger will be handled.

These points don’t predetermine whether a proposal should be approved. They give the committee and applicant a consistent process and help identify the technical, financial and insurance information needed before a decision can be made.

EV charging infrastructure should be assessed, designed and installed by suitably qualified professionals. Advice should be sought from appropriately qualified electrical contractors and, where required, fire safety specialists, engineers or other relevant professionals.

 

Clarify responsibilities and keep clear records

One of the biggest practical challenges for shared buildings is determining how EV charging costs and responsibilities will be managed. Clear arrangements should address:

  • Electricity Who pays for the electricity used and whether individual metering or billing is required
  • Maintenance Who maintains the charger, cabling and associated infrastructure
  • Faults and damage How faults, damage or safety issues will be reported and addressed
  • Safety arrangements Who is responsible for any emergency isolation points, signage and access requirements
  • Removal Who pays for removal and reinstatement if the charger is no longer required
  • Periodic inspection and review How the infrastructure will be reviewed over time to support ongoing safety and performance.

The owners corporation should keep clear records of assessments, approvals, technical advice, installation documentation, maintenance plans and decisions relating to EV charging infrastructure. Good documentation may also help if insurance questions or claims issues arise later.

 

Keep insurance and risk advice connected

EV charging infrastructure may change the way an insurer views a building’s risk profile. Insurers may ask how the infrastructure was installed, whether the electrical system is suitable, where chargers are located, what risk controls are in place, whether suitable risk assessments have been undertaken, and how the equipment will be maintained.

Owners corporations should seek advice early in the process from their strata manager and insurance broker, ideally before installation is approved. Your insurance broker can help identify insurer requirements and any implications for underwriting information, property details, risk requirements or the building’s cover, including additional cover considerations.

The approval process should also include confirming whether the insurer needs to be notified. This doesn’t mean every proposal will affect cover or premium. It means any insurer requirements can be identified before works are finalised.

 

Where the by-laws fit

An owners corporation’s by-laws and approval processes may not have been developed with EV charging in mind. Reviewing them can help the committee identify whether the required information, responsibilities, approval steps, conditions and records are clear.

An insurance broker’s role is to help identify the insurance and risk questions that should be raised early. If the committee considers that new or amended by-laws may be needed, legal advice should be obtained. Technical requirements should be confirmed by appropriately qualified professionals.

Planning ahead can make it easier to accommodate new technology while keeping decisions clear, fair and appropriate for the individual building. Your ASM owners corporation manager can help the committee obtain its current by-laws, review the approval process and coordinate the legal, technical and insurance input required for the building. Speak with your ASM strata manager if your building is receiving EV charging requests or wants to review its approach.

 

More information

1. Australian Government, Charging options for houses and strata buildings

https://www.energy.gov.au/electric-vehicles/owning-electric-vehicle/charging-options-houses-and-strata-buildings

2. NSW Government, Making your apartment building EV ready

https://www.energy.nsw.gov.au/households/transport/electric-vehicles/apartment 

3. Department of Climate Change, Energy, the Environment and Water, Guides to help strata buildings become EV ready

https://www.dcceew.gov.au/about/news/guides-help-strata-buildings-become-ev-ready

 

Looking for more information? We’re here to help.

Enter your contact details and a member of our team will be in touch shortly.

Get a free quote

Enter your details and a member of our team will be in touch shortly.